What are the steps for equipment EPC delivery?
Our full‑scope EPC delivery covers 8 key phases, with an overall project cycle ranging from 4‑8 months:1. Requirement InputReceive the customer’s continuous‑flow process development requirements and conduct feasibility assessment.2. Lab‑scale VerificationCarry out process development and feasibility verification. Generate a report covering process parameters and industrialization orientation.3. Process OptimizationConduct in‑depth optimization of process conditions, collect comprehensive process data for scale‑up design, and deliver a process optimization report.4. Pilot‑scale VerificationPerform pilot‑scale research with pilot‑scale equipment and defined process conditions to verify process scale‑up, and issue a pilot verification report.5. Industrial‑scale Engineering DesignComplete detailed engineering design for industrial‑scale units based on pilot test results.6. Modular Skid FabricationManufacture skid‑mounted reaction equipment in accordance with the industrial‑scale engineering design.7. Equipment DeliveryDeliver static equipment to the customer. Complete on‑site erection, single‑point commissioning, water‑loop test and acceptance inspection.8.Pre‑commissioningThe project owner prepares for start‑up and raw‑material feeding per the pre‑commissioning plan.Total overall lead time: 4‑8 months.